--> Automated Vision Inspection for Flange Screws-RKE Intelligent Technology Co., Ltd.
Blog

Automated Vision Inspection for Flange Screws

Oct 23,2026

Automated Vision Inspection for Flange Screws

A Controlled Feeding and Transfer Process

First, a vibratory bowl feeder arranges the screws and moves them toward the inspection station. The transfer track then guides the parts through the machine. Consistent part presentation matters because camera results depend on the position and view of each component.

A vibratory bowl feeder arranges flange screws before inspection.

The transfer track guides screws from the feeder toward the inspection area.

Camera Inspection Based on the Part Drawing

Next, CCD cameras capture images of the screw at configured inspection points. The video shows three CCD industrial cameras. Camera placement and inspection coverage should match the screw geometry and the customer’s requirements. The inspection plan may include selected dimensions and visible features, but the exact checks must be confirmed during application testing.

 Three CCD industrial cameras are arranged around the inspection path in the demonstrated setup.

Software Results and Automatic Classification

The inspection software presents captured images and result indicators. Based on the configured criteria, the system can classify parts as OK or NG and work with the machine’s sorting mechanism. Manufacturers should define acceptable limits and defect examples before production validation. This step helps align machine decisions with the agreed quality standard.

The software interface displays inspection views and result indicators.

Speed and Accuracy Need Application Validation

The supplied video states a detection speed of 100 pieces per minute and an accuracy of ±0.01 mm. These values describe the demonstrated setup; they are not universal guarantees for every screw. Actual performance depends on part geometry, tolerances, lighting, feeding stability and the inspection criteria. A sample test is the practical way to confirm suitability.

What to Prepare for a Sample Test

To evaluate an application, provide the latest drawing, representative OK and NG samples, critical dimensions, target throughput and examples of defects that matter. With these inputs, the inspection plan can be matched to the component before the final configuration is confirmed.